色爱区综合五月激情-色吧色吧色吧网-色吧亚洲欧美另类-色吧在线视频在线观看-www日本黄色-www三级免费

中文English

SD-2000 Full Hydraulic Core Drilling Rig

PRODUCTS > Full Hydraulic Core Drilling Rig > SD-2000 Full Hydraulic Core Drilling Rig

SD-2000 Full Hydraulic Core Drilling Rig

SD-2000 full hydraulic crawler driving core drilling rig is mainly used for diamond bit drilling with wire line. Because of the use of foreign advanced technology, especially the mature rotation head unit, clamp machine, winch and hydraulic systems, the drilling rig is widely used. It is not only applicable to the diamond and carbide drilling of solid bed, but also to seismic geophysical exploration, engineering geological investigation, micro-pile hole drilling, and construction of small/medium wells.

1. Main Features

(1) Rotation head unit is a piston motor and mechanical gear style which adopts the foreign technique. It has the wide range of speed. Max torque is 4263Nm, so it can satisfy the different project construction and drilling process. When the drill bit is stuck at the end of the hole, it can solve the problem easily by reverse hitting function.

(2) Max speed of the rig is 1120 rpm with torque 680Nm. It has a high torque at high speed which is suitable for deep-hole drilling.

(3) The feeding and lifting system uses the piston hydraulic cylinder to drive the rotation head directly with a long travel and high lifting force which is convenient to the deep-hole core drilling work.

(4) The rotation head unit can move away from the drilling hole, match the clamp and unscrew machine and finish the rope core drilling operation easily, also it does not need the conventional second platform work, especially replace the labor force to open and close the rotation head unit when doing the slant-hole drilling operation.

(5) Rig has the high lifting speed which saves lots of auxiliary time. It is easy to wash the hole when doing the full driving operation, enhancing the drilling efficiency.

(6) The rail of the main mast is l-beam butter-weld steel construction to make sure the high rigidity between the rotation head unit and the main mast. So it has a steady rotation even with high speed which improves the drilling efficiency.

(7) The main winch is imported product with NQ2000M single rope steady and reliable lifting ability.

(8) The wire line winch can get to max speed 205m/min at empty drum, which saved the auxiliary time.

(9) The rig has the clamp and unscrew machine, easy to disassemble the drilling rod and reduces the labor intensity.

(10) Rig feeding system adopts the back pressure-balancing technology. The user can conveniently get the drilling pressure at the bottom of the hold and increase the drill bit life.

(11) The hydraulic system is reliable, mud pump and mud mixing machine are hydraulic controlled. The integrated operation makes it easy to handle all kinds of incidents at the bottom of the hole.

(12) The movement of the crawler is linear controlled, safe and reliable, can climb onto the flat truck by itself which eliminates the cable car’s cost.

(13) The rig is with high reliability, low cost of maintenance and repairing.

2. Technical parameters

Fundamental
  parameters

Drilling depth

Ф56mm(BQ)

2500m

Ф71mm(NQ)

2000m

Ф89mm(HQ)

1400m

Drilling angle

60°-90°

Overall dimension

9500*2240*2900mm

Total weight

16000kg

Hydraulic driving head
  Using hydraulic piston motor and mechanical gear  style(Choose AV6-160 hydraulic motor)

Torque

1120-448rpm

682-1705Nm

448-179rpm

1705-4263Nm

Hydraulic driving head feeding distance

3500mm

Hydraulic driving head feeding system   (single
  hydraulic cylinder
  driving)

Lifting force

200KN

Feeding force

68KN

Lifting speed

0-2.7m/min

Rapid lifting speed

35m/min

Feeding speed

0-8m/min

Rapid feeding high speed

35m/min

Mast displacement system

Mast move distance

1000mm

Cylinder lifting force

100KN

Cylinder feeding force

70KN

Clamp machine system

Range of the clamping

50-200mm

Clamping force

120KN

Unscrew machine system

Unscrew torque

8000Nm

Main winch

Lifting speed

33,69m/min

Lifting force single rope

150,80KN

Diameter of rope

22mm

Cable length

30m

Secondary winch

Lifting speed

135m/min

Lifting force single rope

20KN

Diameter of rope

5mm

Cable length

2000m

Mud pump

Model

BW-350/13

Flow rate

350,235,188,134L/min

Pressure

7,9,11,13MPa

Engine(diesel Cummins)

Model

6CTA8.3-C260

Power/speed

194KW/2200rpm

Crawler

Wide

2400mm

Max. transit sloping angle

30°

Max. loading

20t


主站蜘蛛池模板: 国产精品视频偷伦精品视频 | jjzz日本老师 | 亚洲一区二区三区在线观看蜜桃 | 2022精品福利在线小视频 | 国产一级视频在线观看 | 久久精品九九 | www在线| 中文精品久久久久中文 | 精品视频免费观看 | 天天射天天操天天干 | 免费视频 久久久 | 免费成人福利视频 | 一个人www在线视频 一二三四在线视频社区8 | 国产成人18黄禁网站免费观看 | 午夜影院免费看 | 黄色一级大片儿 | 黄色免费网站在线播放 | 三级三级三级网站网址 | 免费国产成人高清无线看软件 | 欧美aav | 成人羞羞免费视频 | 蝌蚪网在线视频 | 欧美亚洲综合在线 | 无码免费一区二区三区免费播放 | 诱人的护士5中文字幕 | 欧美成人手机视频免费播放 | 播9公社在线精品中文字幕 波少野结衣色在线 | 国产一级片免费 | 天堂网日本 | 欧美亚洲91 | 国产三级a三级三级三级 | 一级欧美| 国产成人在线看 | 欧美精品首页 | 看全色黄大色黄女片做 | 成年片免费网址网站 | 亚洲第一伊人 | 欧美1级| 一区二区三区在线观看视频 | 亚洲一级伦理 | 国产成人亚洲欧美激情 |